www.NoDraftNoWay.org - Draft Threat Level: Elevated
Wednesday, March 02, 2005
"The President has given the Selective Service System a set of readiness goals to be implemented by March 31, 2005. As part of these performance goals, the System must be ready to be fully operational within 75 days. This means we can look for the Draft to be in operation as early as June 15, 2005."
Click on the title to access the site and sign the online petition.
|